Power Profile (PP) Graph
Rider _________________________  Date 1 __________ Date 2 __________ Date 3 __________

Plot average watts for time values 0.2 (12 seconds), 1 minute, 6 minutes, 12 minutes, and 30 minutes versus the average wattage for that time period. Add values for other time intervals (example 2 minutes), if done. The goal is to improve the average wattage for times critical to the race (for example, improve watts for 0.2 minutes for a track with sudden short steeps and narrow track requiring passing, or for 30 minutes if the track has slow long climbs or is flat).

Watts                                  
1300                                  
1250                                  
1200                                  
1150                                  
1100                                  
1050                                  
1000                                  
950                                  
900                                  
850                                  
800                                  
750                                  
700                                  
650                                  
600                                  
550                                  
500                                  
450                                  
400                                  
350                                  
300                                  
250                                  
200                                  
150                                  
100                                  

 Time 0.2

2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34